Oracle | Primavera Risk: Pertmaster Resource Quick Risk

The fourth step of a typical Oracle | Primavera Risk (Pertmaster) Monte Carlo analysis is to load uncertainty or productivity ranges on the network activities.  The previous examples have outlined loading uncertainty on duration.  This training module will discuss loading uncertainty on resources for both schedule and cost estimate Monte Carlo analyses.

Video Walkthrough of Manually Loading Risk Ranges in Oracle | Primavera Risk (Pertmaster) (Duration: 3 min: 34 sec)

Overview of Resource and Cost Uncertainty in Primavera Risk

  • Uncertainty can be applied to the unit amount in the resource quick risk (Risk menu) or manually.
  • Uncertainty can be applied to the cost per unit in the resource setup via the menu path Plan | Resources.

 Manually Loading Resource Uncertainty

  • Select an activity on the Gantt chart view that is loaded with resources.
  • Click the Risk and Uncertainty tab in the navigation pane.
  • A sub-tab will appear for Resource Uncertainty.
  • Check the box “On” for any resource with uncertainty.
  • Click the resource to add uncertainty to.
  • Select  the distribution type from drop-down box.
  • Input the minimum, most likely, and maximum units.

Resource Quick Risk Steps

  • Follow the menu path Risk | Resource Quick Risk
  • Select the option for All tasks in the plan, All filtered tasks, or Selected tasks only.
  • Select the desired resource from the drop-down box or select the option for all assigned resources.
  • Select distribution (Triangle, Beta Pert, etc).
  • Set the minimum, most likely, and maximum percentage values.
  • Click “OK” to apply.

Adding Cost Uncertainty Steps

  • Open the resources interface via the menu path Plan | Resources.
  • Change the Cost Uncertainty drop-down column to “Distribution.”
  • Select the distribution shape, minimum, most likely, and maximum cost in the bottom-right pane.
  • Resources will be saved upon saving the Pertmaster .plan file.


Copyright © 2024 PRC Software. All rights reserved

This will close in 0 seconds


This will close in 0 seconds

The PRC Enterprise Risk Register is a web-based risk management software solution which allows for the tracking of risk at the project and portfolio level.  Audit logs for all risk updates and changes are available at the click of a button to aid with audits, claims and the flow of information.  The power of the PRC Enterprise Risk Register is in the simplicity of the user interface, which is designed to navigate easily at both project and portfolio levels without compromising functionality or data.  The PRC Enterprise Risk Register allows for mapping across project levels so the data can be reported at the portfolio level, even if the work, risk and organizational breakdown structures are not standardized.

Read More

This will close in 0 seconds

The PRC Enterprise Cost Risk Analysis is a customizable web-based solution for simulating estimate cost and determining cost contingency, cost drivers, and risk hotspots. The key to a good risk analysis is good inputs.  The software cannot be a roadblock to success. Good risk software should be easy on the end user. Monte Carlo simulation is already a complex.  The software should simplify the process.

Read More

This will close in 0 seconds

The PRC Enterprise Schedule Risk Analysis is a customizable web-based solution for simulating schedule duration and dates. At PRC Software, we believe that the key to good risk software is through good inputs and excellent user friendliness. A Monte Carlo simulation is already a complex.  The software should not be complicated as well.

Read More

This will close in 0 seconds

PRC specializes in risk analysis, audit, and training.  We have cross-industry experience in fields such as Aerospace & Defense, Oil & Gas, and Engineering & Construction.  We believe that over-complicating the risk process often leads to wasted effort and poor results.  Our goal is to "make it simple."

Read More

This will close in 0 seconds