Enterprise Project Structure – Risk Register

The Enterprise Project Structure page allows the user to create a hierarchy which helps to organize the projects.  The Enterprise Project Structure is made up of nodes which can represent companies, divisions, or business units.  Projects can be assigned to different nodes and may be used for reporting and project assignments to users.  Only users with Read/Write access or View access can view this page.  Users with Read/Write access can add a new node, rename already existing nodes, remove a node, add a project to a node, promote nodes, demote nodes, and change the order of the nodes.  The super user with Read/Write access can import nodes.  Users with View access for the Enterprise Project Structure page can only view the various nodes and projects assigned to it.

 

eps

Figure 1

 

Select Node:

Steps:

  1. Administration —> Enterprise Project Structure
  2. Click on the node shown in the tree structure to select.  (Figure 1)

Import EPS:

EPS nodes can be imported only by Super Users and only if the project has not been assigned to any available nodes.  The imported file must be of type csv, xls, mpp or xer.  Before a file is imported, all nodes except the root node must be deleted in order to accommodate the new nodes.

Steps:

  1. Administration —> Enterprise Project Structure
  2. Click the IMPORT EPS button.  A pop up appears.  (Figure 2)
  3. Click the BROWSE button.  Select the required file.  (Figure 2)
  4. Click the UPLOAD FILE button to finish.  (Figure 2)

Sample sheet used for import:

 

WBS code Description Outline Level
A ABC123

1

B ABC124

2

C ABC125

2

 

Figure 2

 

Export XLS template:

This functionality is used to get a sample XLS file for importing to the breakdown structures.

Steps:

    1. Administration —> Enterprise Project Structure 
    2. Click the EXPORT XLS TEMPLATE button.  User will get a sample template on excel.  (Figure 3)

Sample Excel Template: 

Figure 3

 

Add EPS Node:

This functionality is used to add a new EPS node.

Steps:

  1. Administration —> Enterprise Project Structure
  2. Select a node.
  3. Click the ADD NODE  button.  (Figure 1)  A pop up appears.  (Figure 4)
  4. Enter the node name and description.
  5. Click the SAVE button to save the details.  (Figure 4)

EPS_addnode

Figure 4

 

Remove EPS node:

This functionality removes an existing EPS node.

Steps:

  1. Administration —> Enterprise Project Structure
  2. Select a node.
  3. Click the REMOVE NODE</s


Copyright © 2024 PRC Software. All rights reserved

This will close in 0 seconds


This will close in 0 seconds

The PRC Enterprise Risk Register is a web-based risk management software solution which allows for the tracking of risk at the project and portfolio level.  Audit logs for all risk updates and changes are available at the click of a button to aid with audits, claims and the flow of information.  The power of the PRC Enterprise Risk Register is in the simplicity of the user interface, which is designed to navigate easily at both project and portfolio levels without compromising functionality or data.  The PRC Enterprise Risk Register allows for mapping across project levels so the data can be reported at the portfolio level, even if the work, risk and organizational breakdown structures are not standardized.

Read More

This will close in 0 seconds

The PRC Enterprise Cost Risk Analysis is a customizable web-based solution for simulating estimate cost and determining cost contingency, cost drivers, and risk hotspots. The key to a good risk analysis is good inputs.  The software cannot be a roadblock to success. Good risk software should be easy on the end user. Monte Carlo simulation is already a complex.  The software should simplify the process.

Read More

This will close in 0 seconds

The PRC Enterprise Schedule Risk Analysis is a customizable web-based solution for simulating schedule duration and dates. At PRC Software, we believe that the key to good risk software is through good inputs and excellent user friendliness. A Monte Carlo simulation is already a complex.  The software should not be complicated as well.

Read More

This will close in 0 seconds

PRC specializes in risk analysis, audit, and training.  We have cross-industry experience in fields such as Aerospace & Defense, Oil & Gas, and Engineering & Construction.  We believe that over-complicating the risk process often leads to wasted effort and poor results.  Our goal is to "make it simple."

Read More

This will close in 0 seconds