Primavera Risk: Step 3 – Pertmaster Schedule Check

The third step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is improving the schedule maturity via schedule checks and test Monte Carlo analysis iterations to validate the schedule logic.